New State Group

Innovative Contracting and Renovation Services — NST Saudi Arabia

At NST Saudi Arabia, discover innovative contracting and renovation solutions that blend modern design with functionality. Our expert team is dedicated to redefining spaces through sustainable building techniques and unmatched craftsmanship, catering to the specific needs of our clients across the Kingdom.

High Voltage Cable Installation

Capabilities: Design and implementation of high-voltage cable systems (up to 220 kV), including route planning, trenching, laying, and backfilling.

Technologies Used: GPS and GIS for precise mapping, automated cable laying machinery for increased efficiency.

Project Highlights: Successfully installed over 500 km of high-voltage cables across urban and rural settings, enhancing regional power grids.

Road Construction

Capabilities: Road planning, construction, and maintenance, including highways, city streets, and rural roads.
Technologies Employed: GPS-guided paving equipment, sustainable materials like warm-mix asphalt.
Notable Projects: Over 1000 km of roads constructed, contributing to regional connectivity and economic development.

Renovation and Modernization Services

Types of Renovations: Commercial spaces, luxury residences, historical property renovations.
Custom Solutions: Bespoke interiors, structural modifications, façade improvements.
Sustainability Focus: Integration of sustainable materials and practices to enhance energy efficiency and reduce environmental impact.

Machine Rental

Equipment Available: Excavators, cranes, bulldozers, compactors, and various specialized construction machinery.
Service Features: On-site delivery and setup, operational training, 24/7 customer support, and flexible rental terms.
Usage Scenarios: Short-term rentals for specific project needs, long-term leasing options for extensive projects.

Natural Gas and Sewage Network Installation

Approach: End-to-end solutions from network design to installation and commissioning.
Technology and Methods: Use of trenchless technologies for minimal environmental disruption, HDPE piping systems for durability.
Safety and Compliance: Strict adherence to national and international standards for pipeline safety and environmental protection.

Water Network Installation

Services Offered: Design, installation, and refurbishment of potable, recycled, and wastewater systems.
Advanced Techniques: Use of smart metering and leak detection technologies to ensure system integrity and water conservation.
Client Base: Municipalities, utility companies, large industrial complexes.

Discover Our Projects

Industrial Zone transformers Station

Description:

Connecting the Industrial Zone transformers station to the Narges transformers station and National transformer station.

Client:

Egytech

Scope:

Excavation and installation of medium-voltage cables (66 kV) over a distance of 15 km.

Duration:

10 months

Narges transformers Station

Description:

Connecting the Narges transformers station to the Skakien Station.

Client:

Egytech

Scope:

Excavation and installation of high-voltage cables (220 kV) over a distance of 5 km.

Duration:

6 months

Marassi Sidi Abdelrahman transformer Station

Description:

Connecting the Marassi Sidi Abdelrahman transformers station to the Main Switch Station.

Client:

Egytech

Scope:

Excavation and installation of 36 medium-voltage cables (22 kV) over a distance of 1.2 km.

Duration:

4 months

North October transformers Station

Description:

Connecting the North October transformers station to the Developers transformers station.

Client:

Egytech

Scope:

Excavation and installation of high-voltage cables (220 kV) over a distance of 1 km.

Duration:

1 month

Mansouria power Station

Description:

Connecting the Mansouria Power Station to the main network.

Client:

Egytech

Scope:

Excavation and installation of 12 medium-voltage cables (66 kV) over a distance of 4 km.

Duration:

5 months

FTTX Cable Network

Description:

Development of the Fiber optic cable network (FTTX) in the New Administrative Capital.

Client:

El Sewedy

Scope:

Installation of fiber optic cables over a distance of 5 km.

Duration:

6 months

Future transformers Station

Description:

Connecting the Future transformers station to the SS2 transformers station in the New Administrative Capital.

Client:

El Sewedy

Scope:

Excavation and installation of high-voltage cables (220 kV) over a distance of 7 km.

Duration:

6 months

Bassous transformers Station

Description:

Connecting the Basous transformers station to Bahtim transformers station.

Client:

El Sewedy

Scope:

Excavation and installation of high-voltage cables (220 kV) over a distance of 4 km.

Duration:

4 months

Regional Control Networks in Cairo(CRCC)

Description:

Development of the Cairo CRCC regional control networks using fiber optic cables.

Client:

Egytech

Scope:

Installation of fiber optic cables over a distance of 20 km.

Duration:

12 months

Badr 500/LRT2 transformers station

Description:

Connecting The Badr 500/LRT2 transformer station

Client:

Egytech

Scope:

Excavation and installation of high-voltage cables (220 kV) over a distance of 1 km.

Duration:

1 month

6th of October Station

Description:

Connecting the 6th of October station to the Sheikh Zayed transformers station.

Client:

Energya Power & Telecom Solutions

Scope:

Excavation and installation of high-voltage cables (220 kV) over a distance of 5 km.

Duration:

6 months

Saqr Quraysh Station

Description:

Connecting the Saqr Quraish Station to the East Cairo transformers station.

Client:

El Sewedy

Scope:

Excavation and installation of high-voltage cables (220 kV) over a distance of 5 km.

Duration:

4 months

Embaba transformers station

Description:

Connecting the Embaba transformers station to the West Cairo transformers station.

Client:

Egytech

Scope:

Excavation and installation of high-voltage cables (220 kV) over a distance of 4 km.

Duration:

5 months

Airport Station

Description:

Connecting the Airport Station to the Almaza transformers station (City Center Almaza).

Client:

Egytech

Scope:

Excavation and installation of high-voltage cables (66 kV) over a distance of 7.5 km.

Duration:

8 months

Airport transformers Station

Description:

Connecting the Airport station to the Almaza transformers station (City Center Almaza).

Client:

Egytech

Scope:

Installation of fiber optic cables over a distance of 7.5 km.

Duration:

2 months

Sheikh Zayed Power Station

Description:

Connecting the Sheikh Zayed electricity Station to the Mall of Egypt electricity station on the Wahat Road in 6th of October City.

Client:

Energya Power & Telecom Solutions

Scope:

Excavation and installation of high-voltage cables (66 kV) over a distance of 5 km.

Duration:

5 months