Innovative Contracting and Renovation Services — NST Saudi Arabia
At NST Saudi Arabia, discover innovative contracting and renovation solutions that blend modern design with functionality. Our expert team is dedicated to redefining spaces through sustainable building techniques and unmatched craftsmanship, catering to the specific needs of our clients across the Kingdom.
High Voltage Cable Installation
Capabilities: Design and implementation of high-voltage cable systems (up to 220 kV), including route planning, trenching, laying, and backfilling.
Technologies Used: GPS and GIS for precise mapping, automated cable laying machinery for increased efficiency.
Project Highlights: Successfully installed over 500 km of high-voltage cables across urban and rural settings, enhancing regional power grids.
Road Construction
Capabilities: Road planning, construction, and maintenance, including highways, city streets, and rural roads.
Technologies Employed: GPS-guided paving equipment, sustainable materials like warm-mix asphalt.
Notable Projects: Over 1000 km of roads constructed, contributing to regional connectivity and economic development.
Renovation and Modernization Services
Types of Renovations: Commercial spaces, luxury residences, historical property renovations.
Custom Solutions: Bespoke interiors, structural modifications, façade improvements.
Sustainability Focus: Integration of sustainable materials and practices to enhance energy efficiency and reduce environmental impact.
Machine Rental
Equipment Available: Excavators, cranes, bulldozers, compactors, and various specialized construction machinery.
Service Features: On-site delivery and setup, operational training, 24/7 customer support, and flexible rental terms.
Usage Scenarios: Short-term rentals for specific project needs, long-term leasing options for extensive projects.
Natural Gas and Sewage Network Installation
Approach: End-to-end solutions from network design to installation and commissioning.
Technology and Methods: Use of trenchless technologies for minimal environmental disruption, HDPE piping systems for durability.
Safety and Compliance: Strict adherence to national and international standards for pipeline safety and environmental protection.
Water Network Installation
Services Offered: Design, installation, and refurbishment of potable, recycled, and wastewater systems.
Advanced Techniques: Use of smart metering and leak detection technologies to ensure system integrity and water conservation.
Client Base: Municipalities, utility companies, large industrial complexes.
Discover Our Projects
Industrial Zone transformers Station
Description:
Connecting the Industrial Zone transformers station to the Narges transformers station and National transformer station.
Client:
Egytech
Scope:
Excavation and installation of medium-voltage cables (66 kV) over a distance of 15 km.
Duration:
10 months
Narges transformers Station
Description:
Connecting the Narges transformers station to the Skakien Station.
Client:
Egytech
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 5 km.
Duration:
6 months
Marassi Sidi Abdelrahman transformer Station
Description:
Connecting the Marassi Sidi Abdelrahman transformers station to the Main Switch Station.
Client:
Egytech
Scope:
Excavation and installation of 36 medium-voltage cables (22 kV) over a distance of 1.2 km.
Duration:
4 months
North October transformers Station
Description:
Connecting the North October transformers station to the Developers transformers station.
Client:
Egytech
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 1 km.
Duration:
1 month
Mansouria power Station
Description:
Connecting the Mansouria Power Station to the main network.
Client:
Egytech
Scope:
Excavation and installation of 12 medium-voltage cables (66 kV) over a distance of 4 km.
Duration:
5 months
FTTX Cable Network
Description:
Development of the Fiber optic cable network (FTTX) in the New Administrative Capital.
Client:
El Sewedy
Scope:
Installation of fiber optic cables over a distance of 5 km.
Duration:
6 months
Future transformers Station
Description:
Connecting the Future transformers station to the SS2 transformers station in the New Administrative Capital.
Client:
El Sewedy
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 7 km.
Duration:
6 months
Bassous transformers Station
Description:
Connecting the Basous transformers station to Bahtim transformers station.
Client:
El Sewedy
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 4 km.
Duration:
4 months
Regional Control Networks in Cairo(CRCC)
Description:
Development of the Cairo CRCC regional control networks using fiber optic cables.
Client:
Egytech
Scope:
Installation of fiber optic cables over a distance of 20 km.
Duration:
12 months
Badr 500/LRT2 transformers station
Description:
Connecting The Badr 500/LRT2 transformer station
Client:
Egytech
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 1 km.
Duration:
1 month
6th of October Station
Description:
Connecting the 6th of October station to the Sheikh Zayed transformers station.
Client:
Energya Power & Telecom Solutions
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 5 km.
Duration:
6 months
Saqr Quraysh Station
Description:
Connecting the Saqr Quraish Station to the East Cairo transformers station.
Client:
El Sewedy
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 5 km.
Duration:
4 months
Embaba transformers station
Description:
Connecting the Embaba transformers station to the West Cairo transformers station.
Client:
Egytech
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 4 km.
Duration:
5 months
Airport Station
Description:
Connecting the Airport Station to the Almaza transformers station (City Center Almaza).
Client:
Egytech
Scope:
Excavation and installation of high-voltage cables (66 kV) over a distance of 7.5 km.
Duration:
8 months
Airport transformers Station
Description:
Connecting the Airport station to the Almaza transformers station (City Center Almaza).
Client:
Egytech
Scope:
Installation of fiber optic cables over a distance of 7.5 km.
Duration:
2 months
Sheikh Zayed Power Station
Description:
Connecting the Sheikh Zayed electricity Station to the Mall of Egypt electricity station on the Wahat Road in 6th of October City.
Client:
Energya Power & Telecom Solutions
Scope:
Excavation and installation of high-voltage cables (66 kV) over a distance of 5 km.
Duration:
5 months
Industrial Zone transformers Station
Description:
Connecting the Industrial Zone transformers station to the Narges transformers station and National transformer station.
Client:
Egytech
Scope:
Excavation and installation of medium-voltage cables (66 kV) over a distance of 15 km.
Duration:
10 months
Narges transformers Station
Description:
Connecting the Narges transformers station to the Skakien Station.
Client:
Egytech
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 5 km.
Duration:
6 months
Marassi Sidi Abdelrahman transformer Station
Description:
Connecting the Marassi Sidi Abdelrahman transformers station to the Main Switch Station.
Client:
Egytech
Scope:
Excavation and installation of 36 medium-voltage cables (22 kV) over a distance of 1.2 km.
Duration:
4 months
North October transformers Station
Description:
Connecting the North October transformers station to the Developers transformers station.
Client:
Egytech
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 1 km.
Duration:
1 month
Mansouria power Station
Description:
Connecting the Mansouria Power Station to the main network.
Client:
Egytech
Scope:
Excavation and installation of 12 medium-voltage cables (66 kV) over a distance of 4 km.
Duration:
5 months
FTTX Cable Network
Description:
Development of the Fiber optic cable network (FTTX) in the New Administrative Capital.
Client:
El Sewedy
Scope:
Installation of fiber optic cables over a distance of 5 km.
Duration:
6 months
Future transformers Station
Description:
Connecting the Future transformers station to the SS2 transformers station in the New Administrative Capital.
Client:
El Sewedy
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 7 km.
Duration:
6 months
Bassous transformers Station
Description:
Connecting the Basous transformers station to Bahtim transformers station.
Client:
El Sewedy
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 4 km.
Duration:
4 months
Regional Control Networks in Cairo(CRCC)
Description:
Development of the Cairo CRCC regional control networks using fiber optic cables.
Client:
Egytech
Scope:
Installation of fiber optic cables over a distance of 20 km.
Duration:
12 months
Badr 500/LRT2 transformers station
Description:
Connecting The Badr 500/LRT2 transformer station
Client:
Egytech
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 1 km.
Duration:
1 month
6th of October Station
Description:
Connecting the 6th of October station to the Sheikh Zayed transformers station.
Client:
Energya Power & Telecom Solutions
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 5 km.
Duration:
6 months
Saqr Quraysh Station
Description:
Connecting the Saqr Quraish Station to the East Cairo transformers station.
Client:
El Sewedy
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 5 km.
Duration:
4 months
Embaba transformers station
Description:
Connecting the Embaba transformers station to the West Cairo transformers station.
Client:
Egytech
Scope:
Excavation and installation of high-voltage cables (220 kV) over a distance of 4 km.
Duration:
5 months
Airport Station
Description:
Connecting the Airport Station to the Almaza transformers station (City Center Almaza).
Client:
Egytech
Scope:
Excavation and installation of high-voltage cables (66 kV) over a distance of 7.5 km.
Duration:
8 months
Airport transformers Station
Description:
Connecting the Airport station to the Almaza transformers station (City Center Almaza).
Client:
Egytech
Scope:
Installation of fiber optic cables over a distance of 7.5 km.
Duration:
2 months
Sheikh Zayed Power Station
Description:
Connecting the Sheikh Zayed electricity Station to the Mall of Egypt electricity station on the Wahat Road in 6th of October City.
Client:
Energya Power & Telecom Solutions
Scope:
Excavation and installation of high-voltage cables (66 kV) over a distance of 5 km.
Duration:
5 months
Projects Images









































Our Clients

